November 13, 2025

How Long Does A Bathroom Installation Typically Take?

When planning a bathroom installation in Storrington, Horsham, West Sussex, Pulborough, and Billingshurst it’s natural to wonder how long the project will take. The duration can vary depending on factors such as the size of the bathroom, the complexity of the design, and whether existing plumbing or electrics need upgrading. Having a clear understanding of the process helps you set realistic expectations and plan accordingly. From removing old fittings to installing new fixtures and finishes, each stage contributes to the overall timeline. With the right team in place, your bathroom renovation can be completed efficiently, with minimal disruption to your home.

How Long It Takes to Install a New Bathroom

Day 1–2: Preparation and Removal

The process begins by disconnecting existing plumbing and electrics before removing old tiles, flooring, and sanitaryware. This stage clears the way for new installations and allows engineers to assess the underlying condition of the walls and pipework. If issues such as damp or leaks are discovered, additional repairs may be required before moving forward.

Day 3–6: Plumbing and Electrical Setup

Once the space is stripped back, new pipework and electrical connections are installed to match the updated layout. This stage is crucial for ensuring that your shower, taps, lights, and ventilation all function correctly and safely. If you’re upgrading your system or adding new features like underfloor heating or wall lights, this may extend the schedule by a day or two.

Day 7–10: Walls, Floors, and Tiling

With the technical groundwork complete, attention turns to surfaces. Walls may need plastering or boarding before tiling begins. Tiling typically takes several days, depending on the room size and pattern complexity. Each layer of adhesive and grout requires proper drying time to ensure a durable, professional finish.

Day 11–14: Installing Fixtures and Finishing Touches

The final stage is where your new bathroom truly takes shape. The bath, shower, basin, and toilet are fitted and connected, followed by finishing touches like mirrors, cabinets, and sealant. Everything is tested thoroughly to confirm there are no leaks or faults. A final clean and polish complete the transformation, leaving your bathroom ready for use.

Factors That Can Affect the Timeline

Size of the Bathroom

The size of your bathroom has a major impact on the installation timeline. Smaller bathrooms can often be completed within a week, as there are fewer tiles to fit and less pipework to manage. In contrast, larger bathrooms with multiple fixtures, double sinks, or additional storage areas may take longer simply because there’s more work involved. The layout also plays a role, rearranging the location of a bath or toilet requires extra plumbing adjustments that can extend the schedule.

Custom Features and Finishes

If you’re including bespoke design elements, such as built-in cabinetry, walk-in showers, or underfloor heating, expect the project to take longer. Custom features require precision installation and often additional coordination between different trades. For example, fitting underfloor heating involves insulation layers, electrical connections, and careful testing before the flooring can be laid. Similarly, intricate tile patterns or custom joinery take time to perfect, ensuring your finished bathroom meets your exact design vision.

Availability of Materials

Delays in material deliveries are one of the most common reasons for extended project times. Tiles, fixtures, and bespoke units that are made to order can have longer lead times, especially if sourced from specialist suppliers. To avoid interruptions, it’s always best to confirm product availability before starting the installation. At Pipeline Plumbing Services, we recommend ordering all key materials early in the process so that everything is ready when the work begins.

Condition of Existing Plumbing and Electrics

Many older homes have outdated or worn pipework and electrical systems, which may need upgrading to meet current safety standards. During the initial inspection, our team checks for corrosion, leaks, or non-compliant wiring. If significant repairs or replacements are needed, this will naturally extend the installation time. However, addressing these issues early ensures your new bathroom is safe, efficient, and built to last.

Additional Considerations

Other factors can also influence the timeline, such as access to the property, unforeseen structural repairs, or last-minute design changes. Effective communication and thorough preparation can help prevent these from becoming major delays, allowing your installation to run as smoothly as possible.

Expert Bathroom Installations in Storrington, Horsham, West Sussex, Pulborough, and Billingshurst

Ready to transform your bathroom? Pipeline Plumbing Services offers professional bathroom installations. Our team manages every aspect of the project with precision and care, ensuring a seamless experience from design to completion. Call us today on 01903 740538 or 07871 725133, or fill out our contact form to start planning your new bathroom.

Latest Posts

Where courtesy meets excellence

We're here to help. Contact us today and we'll be more than happy to assist you.